Ecological Sanitation, Organic Animal Farm, and Cogeneration: Closing the Loop in Achieving Sustainable Development-A Concept Study with On-Site Biogas Fueled Trigeneration Retrofit in A 900-Bed University Hospital

dc.contributor.authorTaseli, Basak K.
dc.contributor.authorKilkis, Birol
dc.contributor.orcID0000-0003-2580-3910en_US
dc.contributor.researcherIDAAJ-2321-2020en_US
dc.date.accessioned2023-07-07T08:34:38Z
dc.date.available2023-07-07T08:34:38Z
dc.date.issued2016
dc.description.abstractHealthcare facilities mostly consume natural gas or fuel oil, utilize grid power, and are the second most energy intensive sector in the USA. Besides their high fossil fuel expenditures, hospital buildings generate large amounts of plumbing wastes and others, such that they are the largest producer of GHG emissions in the building sector. Energy costs are consuming up to 15% of their annual profits. In this paper the overall environmental and economic problems that may be associated especially with large healthcare facilities are addressed by showing ways to convert their energy and environmental disadvantages into advantages. In this respect, a concept study with ecological sanitation and formation of an energy, water, food, and education nexus by primarily employing a trigeneration system operating with biogas at an optimum fuel share with natural gas for retrofitting an existing 900-bed University hospital is presented. This case study covers two scenarios. The first scenario is the base scenario, which utilizes three trigeneration engines, with one 1,25 MWe, and two 2,2 MWe capacity each, all running on natural gas with a total capacity of 5,65 MWe. The second scenario includes three stages. The first stage mixes natural gas with biogas, which is to be produced on-site by primarily using plumbing wastes, for driving the 1,25 MWe engine, which satisfies the constant base load of the hospital for 24h a day. The second stage produces biogas by making use of the widely available surrounding free land of the hospital in a new eco-farm development and replaces the fuel input of the first 2,2 MWe engine, which operates 16 h a day on average. In the third stage the second trigeneration unit with 2,2 MWe capacity remains on natural gas fuel input and operates approximately 8 h a day (peaking engine). Both scenarios have an absorption cooling system with the same capacity and an 8 MWc-h ice tank. This common base of identical power, heat, and cold capacities was aimed to independently focus on the environmental and economic benefits of biogas substitution covering a ten-year operational period. The next system for stage two involves a new organic 6000 livestock-animal organic farm and a dairy factory to be owned by the University, which completes the food, water, energy, education and environment nexus and serves as a full-scale hands-on farm for the Department of Agriculture students and provide an R&D platform. It has been shown that such an application closes the loop towards sustain ability. The organic venture is expected to have a large economic impact and important contributions also on the dietary needs of the patients. The organic farm is envisioned to incorporate greenhouses, wind, and solar farms. Yet this study only covers the impact of the biogas supply to the trigeneration system: CO2 emissions from biogas generation is assumed to be captured and utilized for dry ice production. Analyses show that the additional cost of on-site biogas anaerobic digester and its ancillaries of the. first-stage (1,25 MWe) may pay back themselves in four years. The corresponding prediction for the second stage biogas trigeneration system with biogas fuel (2,2 MWe) is also four years. Total reduction in CO2 emissions attributable to the biogas conversion of the trigeneration system is 161558,2 t CO2 over a ten-year period, taking into account the additional reductions due to improvements in rational exergy management of the energy resources. The net total savings from biogas conversion in two stages is expected to be about 4 M(sic) for a ten-year period. (C) 2016 Elsevier B.V. All rights reserved.en_US
dc.identifier.eissn1872-6178en_US
dc.identifier.endpage119en_US
dc.identifier.issn0378-7788en_US
dc.identifier.scopus2-s2.0-84980343982en_US
dc.identifier.startpage102en_US
dc.identifier.urihttp://hdl.handle.net/11727/9878
dc.identifier.volume129en_US
dc.identifier.wos000383811100010en_US
dc.language.isoengen_US
dc.relation.isversionof10.1016/j.enbuild.2016.07.030en_US
dc.relation.journalENERGY AND BUILDINGSen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergien_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectBiogas generationen_US
dc.subjectOrganic farmen_US
dc.subjectEco-sanitationen_US
dc.subjectHospital energy system retrofiten_US
dc.subjectTrigenerationen_US
dc.subjectAbsorption coolingen_US
dc.subjectRational Exergy Management Modelen_US
dc.titleEcological Sanitation, Organic Animal Farm, and Cogeneration: Closing the Loop in Achieving Sustainable Development-A Concept Study with On-Site Biogas Fueled Trigeneration Retrofit in A 900-Bed University Hospitalen_US
dc.typearticleen_US

Files

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: