Seismic Assessment of Electrical Equipment in Power Substations: A Case Study for Circuit Breakers

dc.contributor.authorKaatsiz, Kaan
dc.contributor.authorAlici, Firat Soner
dc.contributor.authorErberik, Murat Altug
dc.date.accessioned2026-08-05T06:42:21Z
dc.date.issued2024-07-18
dc.description.abstractElectric power is essential in post-earthquake periods for the continuous functionality of disaster management and emergency services. In addition, interruption of electric power can cause significant economic losses due to downtime of critical facilities. Therefore, it is very important to maintain seismic safety of electric power systems and components. There are existing seismic regulations and standards regarding electric power systems, especially in the United States of America (USA) and Europe. A similar regulation has been prepared recently in T & uuml;rkiye, which is a country in a seismically active region. This study focuses on the current state of practice regarding the seismic assessment of electrical equipment in power stations and implementation of the regulations on seismic qualification of these systems. Among many electrical equipment, circuit breakers have been selected for case study. The seismic assessment of the selected high voltage equipment has been performed according to the new regulation under the seismic hazard specifically defined for T & uuml;rkiye. The case study experiment presents the new methodology in evaluating and classifying the seismic response of high voltage electrical equipment and provides insight to the expected behaviour of circuit breakers under earthquake induced action.
dc.identifier.citationTURKISH JOURNAL OF CIVIL ENGINEERING, cilt 35, 2024, sayı 4, ss. 49-68en
dc.identifier.issn2822-6836
dc.identifier.issue4en
dc.identifier.urihttps://hdl.handle.net/11727/15284
dc.identifier.volume35en
dc.identifier.wos001263359500003en
dc.language.isoen_US
dc.publisherBaşkent Üniversitesi Mühendislik Fakültesi
dc.sourceTURKISH JOURNAL OF CIVIL ENGINEERINGen
dc.subjectseismic qualification
dc.subjectcircuit breaker
dc.subjectpower station
dc.subjectelectrical equipment
dc.subjectseismic assessment
dc.titleSeismic Assessment of Electrical Equipment in Power Substations: A Case Study for Circuit Breakers
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
10.18400-tjce.1241107-2912091.pdf
Size:
2.78 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: